Menu Close

DSO APPROVAL

dubai silicon oasis

DSO APPROVAL – DUBAI SILICON OASIS AUTHORITY APPROVALS

Dubai Silicon Oasis Authority, a 100% government-possessed area that advances contemporary innovation-based enterprises with urban ace organized network, with-it framework, and in-house business administrations. Dubai semiconducting material Oasis that is usually termed as DSO Approval may be a trade zone established by metropolis government within the year of 2004. The trade zone was established with the only real purpose of developing metropolis because of the business hub for prime technical industries. With several incentives and facilities provided by DSO, the technical park has been ready to attract several high technical industries from round the world. Spread within the space of 7.2 sq. kilometers the govt of the metropolis has invested with to develop the simplest facilities within the zone, therefore, creating it all a lot of enticing places to begin a business.

Why choose DSO Approval ?

Becoming a district of DSO Approval comes with several incentives and advantages. A high technical business in DSO Approval features a Brobdingnagian likelihood of growth and recognition.  Some reasons to line up a business in DSO Approval area unit as follows:
  • DSO Approval contains all sorts of recent facilities that a high technical business needs.
  • The premises conjointly contain the fire, water, and irrigation system with hygienically water network.
  • The technical park is a entranceway to achieve dead set billions of individuals.
  • The technical park imposes no tax nor will it impose any company tax.
  • The technical park provides E-business system with fast and economical services.
  • The rules and rules at intervals the technical park area unit clear and stable.
  • The technical park has a simple licensing method and low value of operations.
  • The visa process for the staff is additionally fast.

What We DSO Approval ?

  • we take proper attention and at most care to obtain Fit Out Permit For You from DSOA 
  • We will Prepare all the required Drawings and Collect the Documents Provided  by client
  • Also we will be supporting the Client until the Fit Out works are finished and the Completion Certificate is issued.

Benefits from DSO:

1. Sophisticated facilities needed for hi-tech business.
2. A platform to succeed in bent on target market around the world.
3. Free from any tax levies
4. Efficient E-business system with fast services.
5. clear and stable rules and laws
6. Easy licensing method and low operational value.
7. The quick visa process for workers.

Documents required DSO Approval

1. Letter of intent
2. Copy of passport of the manager
3. Freehold/ demesne acknowledgment kind.
4. Filled up the appliance kind
5. Copy of Doctor of Education, Unit deed and workplace occupancy contract

Required Documents for DSO Approval

1. Civil defense approved drawings original if needed
2. Consultant Contractor appointment letter signed by the Tenant
3. Existing projected Layouts
4. Original automotive policy and third-party insurance
5. Original Notification Letter from the building owner homeowners Association to
6. DSOA
7. Tenants Name and Complete Address
8. Unit lease contract

From tenant side

1. Copy of Trade license
2. Copy of RERA (EJARI) )
3. NOC from the landlord/building owner/developer/property management
4. Contractor appointment letter (original)
5. copy of abidance contract and deed of conveyance (if chartered by deed of conveyance holder)
6. NOC from the deed of conveyance holder (if applicable)
7. AS-BUILT drawings in CD
8. DCD approval
9. DSO drawings review charges (15oo DHS mini/ or 66 fils/ feet² as per tenancy)
10. CAR policy (Contractor all risk policy)

From contractor side

1. Filled Application
2. Job acceptance letter
3. Softcopy in CD
4. Trade license copy
5. outline the program of labor/scope of work
6. All drawings (thoroughly reviewed and self-signed) within the following the order

Civil DSO Approval

  1. Keyplan
  2. Existing architectural plan
  3. Proposed architectural plan
  4. Proposed Flooring material layout
  5. Proposed Ceiling layout
  6. Proposed mirrored Ceiling layout
  7. The proposed article of furniture layout
  8. Section

Mechanical DSO Approval

1. Existing HVAC layout
2. Proposed HVAC layout
3. Existing fireplace mechanical device
4. Proposed mechanical device
5. Existing water system and drainage (for the restaurant only)
6. The proposed water system and drainage (for the restaurant only)

Electrical DSO Approval

1. Existing and planned load schedule
2. Existing lighting layout
3. Proposed lighting layout (including circuit variety with dB name)
4. Existing power layout
5. Proposed Power layout
6. Existing smoke detector layout
7. Proposed smoke detector layout
8. Existing Emergency + Exit layout
9. Proposed Emergency + Exit layout
10. Power layout coordinated with the article of furniture

Call Now Button
×

Powered by WhatsApp Chat

× How can I help you?